[New post] Anthe Update No. 5

Site logo image Lost Art Press posted: " The first floor of the Anthe building on Saturday. The retail store is coming along. All the drywall is required by the country for fire suppression. When you rehabilitate an old building, your plans have to change (almost daily) to keep things moving" Lost Art Press

Anthe Update No. 5

Lost Art Press

Aug 14

The first floor of the Anthe building on Saturday. The retail store is coming along. All the drywall is required by the country for fire suppression.

When you rehabilitate an old building, your plans have to change (almost daily) to keep things moving forward and to code.

The "code" part of the project is what has been driving us for the last few weeks. We want the building to look like it did when we bought it and was empty. But it also has to be safe and adhere to the county's regulations if we ever want to occupy it.

This week, the fire-resistant drywall went in around the stairwell, and it was (honestly) a bit dispiriting. I know we are going to cover parts of the drywall with beadboard (some of it original), which will look better. But the drywall really changes the look of the place. And it made us re-evaluate how we are going to use the second floor of the building.

The second floor with the required drywall (the steel ceiling had to be pulled off for the drywall – not our call). The boxed-in stairwell shrinks the space for our offices. We will likely give this floor up to storage.

My hope all along has been to use the second floor as our editorial offices, with excess storage at the rear of the second floor

But after the walls went up to meet code and were covered in the first layer of drywall, it was obvious that the second floor isn't ideal for offices. The fire-resistant walls interrupt the building's front windows. And the resulting space (and all the mechanicals on the wall), made me rethink the space.

I think we are going to devote the entire second floor to storage. 

After some thought, this makes good sense. The second floor has a double door at the rear (right above our loading area). We can use our forklift to put pallets directly into the second floor from a delivery truck. No elevator necessary. 

The third floor is more spacious. Plus we don't need to remove all of the ceiling. This will likely become our offices. I hope....

The third floor looks like our future editorial offices. The fire-rated drywall area is much smaller, so the space is more open. And we don't have any plans for it yet. This allows us to grow with lots of storage on the second floor and offices on the third floor, with room for workbenches and all the other things in my head.

Despite all this faffing, we are getting close to occupancy. If our schedule holds, we will be able to move fulfillment operations to Anthe by the end of this month. 

It's not all dispiriting. We have a new functioning awning on the front of the building, which looks fantastic and works. Our bathroom works and is to code (after moving a wall about 5/8").

And this is my fourth rodeo with 19th-century building rehabs. I know it is always worth it in the end. I had a similar crisis with all of the other buildings we've rehabbed. We get through it. And it's awesome.

Thanks for all of you who have helped fund the restoration. It has made a real difference.

— Christopher Schwarz

Comment

Unsubscribe to no longer receive posts from Lost Art Press.
Change your email settings at manage subscriptions.

Trouble clicking? Copy and paste this URL into your browser:
https://blog.lostartpress.com/2023/08/14/anthe-update-no-5/

WordPress.com and Jetpack Logos

Get the Jetpack app to use Reader anywhere, anytime

Follow your favorite sites, save posts to read later, and get real-time notifications for likes and comments.

Download Jetpack on Google Play Download Jetpack from the App Store
WordPress.com on Twitter WordPress.com on Facebook WordPress.com on Instagram WordPress.com on YouTube
WordPress.com Logo and Wordmark title=

Automattic, Inc. - 60 29th St. #343, San Francisco, CA 94110  

at August 14, 2023
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

[New post] Woods Hardware Building – Cincinnati, Ohio

...

  • [New post] Woods Hardware Building – Cincinnati, Ohio
    ...
  • [New post] What to do with a hole in the floor?
    PMu posted: "I post a drawing everyday so make sure you follow so you don't miss out on tomorrow's doodle! I...
  • [New post] Jungle Waterfall
    Markosun posted: " Tumpak Sewu, also known as Coban Sewu, is a tiered waterfall that is located between the Pronojiwo D...

Search This Blog

  • Home

About Me

Natureimpactfactor
View my complete profile

Report Abuse

Labels

  • 【ANDROID STUDIO】Await and Async
  • 【FLUTTER ANDROID STUDIO and IOS】animated opacity
  • 【GAMEMAKER】Parallax
  • 【PYTHON】Mean Estimated Accuracy Logistic Regression
  • 【Visual Studio Visual Csharp】Mutex
  • 【Visual Studio Visual VB net】Map Network Drive Wizard

Blog Archive

  • August 2023 (660)
  • July 2023 (866)
  • June 2023 (796)
  • May 2023 (775)
  • April 2023 (809)
  • March 2023 (905)
  • February 2023 (834)
  • January 2023 (905)
  • December 2022 (865)
  • November 2022 (878)
  • October 2022 (940)
  • September 2022 (786)
  • August 2022 (745)
  • July 2022 (823)
  • June 2022 (903)
  • May 2022 (1064)
  • April 2022 (967)
  • March 2022 (786)
  • February 2022 (638)
  • January 2022 (726)
  • December 2021 (1190)
  • November 2021 (3136)
  • October 2021 (3242)
  • September 2021 (3141)
  • August 2021 (3246)
  • July 2021 (3249)
  • June 2021 (3143)
  • May 2021 (301)
Powered by Blogger.