Site logo image DEB Science Staff posted: " We know a lot of investigators plan for projects that last about 3 years, but did you know 5 years is the maximum duration for new awards? Regardless of the planned duration of a project, there are  opportunities to extend that through no-cost exten" DEBrief

No-Cost Extensions

DEB Science Staff

May 4

We know a lot of investigators plan for projects that last about 3 years, but did you know 5 years is the maximum duration for new awards? Regardless of the planned duration of a project, there are  opportunities to extend that through no-cost extensions (NCEs) to allow you to complete your project. It's important to note NCEs are not for the purpose of using up unliquidated balances. See the PAPPG: https://beta.nsf.gov/policies/pappg/23-1/ch-6-nsf-awards#6D3c.

There are certain situations that could limit the number of no-cost extensions available for a given project, e.g., the type of award (standard versus continuing) and the original duration of an award. The issue is usually the availability of unspent funds because you cannot get a no-cost extension if you don't have any funds left to use, and federal funds expire after 7 years. See our [NSF Award Spending – Some Things to Know] post.

If you plan on submitting a request for a no-cost extension, you need to do so BEFORE the final annual report is submitted.

Here are the key points around no-cost extensions from our How to Write a Great Annual Report Office Hours:

  1. Grantees (your institution) are pre-authorized by NSF to receive a one-time extension of the end date of the grant (up to 12 months) if additional time is required to assure completion of the original scope of work with existing funds. All "grantee-approved" extension requests must be signed and submitted by your institutional representative (SRO) via NSF's electronic systems. If you are going to request a no-cost extension, always first request the "grantee-approved" type.
  2. If additional time beyond the first NCE is required, and exceptional circumstances warrant, a formal request for a second NCE to NSF must be signed and submitted by the institutional grants officer via NSF's electronic systems. The request should be submitted at least 45 days prior to the end date of the grant. This is called an "NSF-approved" no-cost extension and is a bigger deal than the "grantee-approved" type. You will need to provide the current balance (funds remaining) of the award and your plans for spending it.
  3. Regardless of which type of no-cost extension you may request, it's critically important to understand that remaining funds can only be spent on work described in your funded proposal (i.e., within the original scope of your award). If you have questions about this, it's best to call the NSF Program Officer who is managing your award. Although work must remain within the scope of the original award, PIs are free to move funds among most budget categories (e.g., Materials & Supplies, Publication Costs, etc.) without formal approval from NSF. Changes to "Participant Support Costs", however, do require permission.

As always, any questions you have about your award can be directed to the managing Program Officer. 

Comment
Like
Tip icon image You can also reply to this email to leave a comment.

Unsubscribe to no longer receive posts from DEBrief.
Change your email settings at manage subscriptions.

Trouble clicking? Copy and paste this URL into your browser:
http://debblog.nsfbio.com/2023/05/04/no-cost-extensions/

WordPress.com and Jetpack Logos

Get the Jetpack app to use Reader anywhere, anytime

Follow your favorite sites, save posts to read later, and get real-time notifications for likes and comments.

Download Jetpack on Google Play Download Jetpack from the App Store
WordPress.com on Twitter WordPress.com on Facebook WordPress.com on Instagram WordPress.com on YouTube
WordPress.com Logo and Wordmark title=

Learn how to build your website with our video tutorials on YouTube.


Automattic, Inc. - 60 29th St. #343, San Francisco, CA 94110  

at May 04, 2023
Email ThisBlogThis!Share to XShare to FacebookShare to Pinterest

No comments:

Post a Comment

Newer Post Older Post Home
Subscribe to: Post Comments (Atom)

[New post] Woods Hardware Building – Cincinnati, Ohio

...

  • [New post] Jungle Waterfall
    Markosun posted: " Tumpak Sewu, also known as Coban Sewu, is a tiered waterfall that is located between the Pronojiwo D...
  • [New post] Woods Hardware Building – Cincinnati, Ohio
    ...
  • [New post] What to do with a hole in the floor?
    PMu posted: "I post a drawing everyday so make sure you follow so you don't miss out on tomorrow's doodle! I...

Search This Blog

  • Home

About Me

Natureimpactfactor
View my complete profile

Report Abuse

Labels

  • 【ANDROID STUDIO】Await and Async
  • 【FLUTTER ANDROID STUDIO and IOS】animated opacity
  • 【GAMEMAKER】Parallax
  • 【PYTHON】Mean Estimated Accuracy Logistic Regression
  • 【Visual Studio Visual Csharp】Mutex
  • 【Visual Studio Visual VB net】Map Network Drive Wizard

Blog Archive

  • August 2023 (660)
  • July 2023 (866)
  • June 2023 (796)
  • May 2023 (775)
  • April 2023 (809)
  • March 2023 (905)
  • February 2023 (834)
  • January 2023 (905)
  • December 2022 (865)
  • November 2022 (878)
  • October 2022 (940)
  • September 2022 (786)
  • August 2022 (745)
  • July 2022 (823)
  • June 2022 (903)
  • May 2022 (1064)
  • April 2022 (967)
  • March 2022 (786)
  • February 2022 (638)
  • January 2022 (726)
  • December 2021 (1190)
  • November 2021 (3136)
  • October 2021 (3242)
  • September 2021 (3141)
  • August 2021 (3246)
  • July 2021 (3249)
  • June 2021 (3143)
  • May 2021 (301)
Powered by Blogger.